Youth Center St. Benedikt, Nütschau Monastery – Construction Process

A place becomes reality

PROJECT DATA

 

 

 

 

 

 

 


Ground Floor Plan     Execution Planning, Holzbau Gehrmann

 

 


Roof Surface Unfolding    Execution Planning, Holzbau Gehrmann

 

 


Cross-Sections   Execution Planning, Holzbau Gehrmann

Concept Design PhaseRealisation

ProgrammeYouth guesthouse with overnight accommodations for 40 people (10 guest rooms with bathrooms), event area for 50 people (plenum hall and meditation room), as well as central reception area with kitchen and dining room
Statusrealisation
LocationNüstschau Monastery, Travenbrück, Germany
ClientBenediktinerpriorat St. Ansgar, Kloster Nütschau
TeamIMKEWOELK + partners, structural engineering and building physics: ZRS, Berlin
AreaGFA: 680 m2, NUA: 534 m2, GCV: 2.351 m3
ConstructionPrefabricated timber skeleton structure
ServicesProgram and site analysis, strategic development, artistic concept, technical concept, visualization, design planning, permit planning, execution planning, tendering and awarding
SustainabilityUse of materials with high reusability and recyclability, as well as a low CO₂ footprint. Air-source heat pump and full-surface photovoltaic roof for electricity generation, natural ventilation concept, integration of CO₂-binding green structures in the outdoor areas, minimized access infrastructure, and preservation of the existing building.
Date2025

 

TOP ↑